Calvin Perry, left, and Jerry Keller measured gravel for the reworked roadbed on the exit ramp from the inner loop of New Circle Road.
Calvin Perry, left, and Jerry Keller measured gravel for the reworked roadbed on the exit ramp from the inner loop of New Circle Road.
Calvin Perry, left, and Jerry Keller measured gravel for the reworked roadbed on the exit ramp from the inner loop of New Circle Road.

Ramp closing requires detours in Lexington

June 18, 2011 12:00 AM