Traffic report

Work is to be done between 9 a.m. and 3 p.m. unless otherwise noted.

Special notes

The Division of Traffic Engineering will install four-way stop signs and pavement markings at the intersection of Cramer and Richmond avenues on Dec. 12 if weather conditions are satisfactory. Drivers should use caution while traffic adjusts to the new traffic control measure.

The Division of Traffic Engineering will install three-way stop signs and pavement markings at the intersection of Owsley and Menifee avenues on Dec. 19, if weather conditions are satisfactory. Drivers should use caution while traffic adjusts to the new traffic control measure.

Major traffic impact

The right lane of the inner loop of Man o' War Boulevard will be blocked between Beaver Creek Drive and Pimlico Parkway from 8 a.m. to 6 p.m. through Dec. 12, for sidewalk replacement. The right lane of the inner loop of Man o' War Boulevard will also be blocked between Pimlico Parkway and Jocasta Drive through Dec. 23, for sidewalk work.

Two lanes of South Limestone will be blocked — one in each direction — between Cooper Drive and Conn Terrace, from 6 p.m. to 6 a.m. through Dec. 23 for utility work.

East Seventh Street will be closed for sewer line replacement between North Martin Luther King Boulevard and Maple Avenue, through 4 p.m. Dec. 12. Eastbound traffic will be detoured to North Limestone to Loudon Avenue to Maple Avenue to Seventh; westbound traffic will be detoured to Maple Avenue to East Sixth Street to North Limestone to Seventh.

Significant traffic impact

The right outbound lane of Nicholasville Road will be blocked from 9 a.m. to 3 p.m. between Waller Avenue and Dantzler Drive through Dec. 12, for utility work.

The left inbound lane of Nicholasville Road will be blocked at Alumni Drive through Dec. 10, for cable work.

The inbound right turn lane of South Limestone will be blocked at Transcript Avenue from Monday through Tuesday for utility work.

The inbound lane on Palumbo Drive and the southbound right turn lane of Man o' War Boulevard will be blocked from Monday through Wednesday for cable work.

The outbound right lane of Harrodsburg Road will be blocked between Shaker Drive and Lane Allen Road through Dec. 11, for cable work.

The right through lane of Nicholasville Road will be blocked between Zandale and Jesselin Drive from Monday through Dec. 12, to install a fire hydrant.

Two lanes of Cooper Drive — one in each direction — will be blocked at South Limestone from 6 p.m. to 6 a.m. Dec. 15-23, for utility work.

A portion of Algonquin Street near Main and West Short streets will be blocked through Dec. 31 for construction work.

The right lanes of both inbound and outbound Versailles Road will be blocked at Terrace View Drive through Dec. 12 for pavement repairs.

The inbound and outbound lanes of Nicholasville Road will be blocked one lane at a time between West New Circle Road and West Tiverton Way through Dec. 12, for utility work.

Lanes of Westwood Drive will be blocked as needed between Nicholasville Road and Elizabeth Street from 8 a.m. to 4 p.m. through Dec. 15, for utility work.

Twelfth Street will be closed to all through traffic between North Broadway and North Limestone through Jan. 31.

Moderate traffic impact

Lanes of Water Street will be blocked as needed between Ayres Alley and Hernando Alley from 8 a.m. to 4 p.m. from Monday through Dec. 12, for construction work.

Holiday Road will be blocked as needed between Menifee Avenue and Bon Air Drive from 8 a.m. to 4 p.m. through Dec. 12, for sanitary sewer repair.

The eastbound lane of Aurora Avenue will be blocked at Memory Lane from 8 a.m. to 4 p.m. through Dec. 12, for utility work.

The eastbound lane of Mercer Road will be blocked between Harbison Road and Baker Court from 8 a.m. to 4 p.m. from Monday through Dec. 19, for road repairs.

Morrison Avenue will be blocked between North Broadway and the end of the street from 8 a.m. to 4 p.m. through Dec. 19, for utility work.

The sidewalk and bike lanes of Euclid and Woodland avenues will be blocked through Dec. 23, to install a large utility pole.

SOURCE: LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT