Fayette County

Weekly traffic report

Work is done between 9 a.m. and 3 p.m. unless noted.

Major traffic impact

Downtown Streetscape Project: Rotating one-lane closures will occur on West Main Street from Martin Luther King Boulevard to Broadway and on n West Vine Street from Broadway to Limestone from 9 a.m. to 3 p.m. and 6 to 10 p.m. through Aug. 20.

The inbound and outbound left lanes and dual turn lane of North Broadway will be blocked between West Seventh Street and the bridge from 6 p.m. to 6 a.m. through Aug. 31 for utility work.

Both lanes of Ky. 1966/Military Pike are closed from 0.00 mile point to 0.9 mile point. Repair work is expected to start soon and continue through Sept. 15.

State contractors are resurfacing New Circle Road between Versailles Road and Georgetown Road through Aug. 15. Work hours are 7 p.m. to 6 a.m. Motorists should expect lane closures, with one lane open at all times. The speed limit in the work area is 45 mph.

State contractors are resurfacing Nicholasville Road from The Mall at Lexington Green to Southland Drive from 8 p.m. to 6 a.m. through July 31. Work at night will vary.

The right curb lane of southbound (inner loop) Man o' War Boulevard will be blocked between Helmsdale Place and Mapleleaf Drive through Aug. 31 to widen the roadway.

Bowman Mill Road will be closed 24 hours a day to all traffic from Old Harrodsburg Road to Parkers Mill Road through Wednesday to install a sewer line.

Various lanes of West Vine Street will be closed between South Broadway and South Limestone for construction work, from 9 a.m. to 3 p.m. and 6 p.m. to 6 a.m. if necessary. Two lanes will remain open, and work is scheduled to be completed by July 23.

The inbound and outbound left lanes and center lanes of North Broadway will be blocked between West Sixth and West Seventh streets from 6 p.m. to 6 a.m. through Friday for utility work.

The right outbound lane of South Limestone will be blocked between Scott Street and Virginia Avenue through July 30 to install a new water main.

Significant impact

The right inbound lane of East Main Street will be blocked at North Ashland Avenue on July 22 for utility work.

Old Todds Road will be closed between Palumbo Drive and Caden Lane from 8 a.m. to 4 p.m. Monday through Friday for roadway repairs. Use Man o' War Boulevard as an alternate route.

South Upper Street will be blocked between West Maxwell and West High streets Monday for utility work.

There will be alternating inbound lane closures as needed on West Main Street at Newtown Pike from Monday through July 30 for milling, paving, storm sewers and guttering.

Lanes of South Limestone will be blocked at Conn Terrace one side at a time from Monday through Saturday to clean the new pedway.

The northbound curb lane of Elm Tree Lane will be blocked at East Third Street 24 hours a day through Friday for work on the Lyric Theater.

Pine Meadow Road will be closed 24 hours a day between Summerville and Pinkney drives through Friday to replace sewer lines.

Moderate impact

Georgetown Road will be blocked at Old Iron Works Road from 4 a.m. to 6 a.m. Monday for utility work.

Lanes of Charles Avenue will be blocked at Ash Street from 8 a.m. to 4 p.m. through Wednesday for utility work.

  Comments